Loading...
Changeset: 108513753
Changed section of Schuylkill River Trail in Monocacy Station that is closed for bridge construction to highway=construction.
Closed by rjb4095
Tags
changesets_count | 3847 |
---|---|
created_by | iD 2.19.6 |
host | https://www.openstreetmap.org/edit |
imagery_used | Mapbox Satellite;Custom (https://heatmap-external-{switch:a,b,c}.strava.com/tiles-auth/both/hot/{zoom}/{x}/{y}.png?Key-Pair-Id=APKAIDPUN4QMG7VUQPSA&Policy=eyJTdGF0ZW1lbnQiOiBbeyJSZXNvdXJjZSI6Imh0dHBzOi8vaGVhdG1hcC1leHRlcm5hbC0qLnN0cmF2YS5jb20vKiIsIkNvbmRp |
locale | en |
Discussion
Ways (8)
- 966845191, v1
- Main Street (46594737), v6
- Schuylkill River Trail (Thun Section) (817913871), v5
- Schuylkill River Trail (Thun Section) (817913873), v4
- Schuylkill River Trail (Thun Section) (817913874), v5
- Schuylkill River Trail (Thun Section) (817913875), v5
- Schuylkill River Trail (Thun Section) (817913876), v5
- Schuylkill River Trail (Thun Section) (902368015), v4
Nodes (3)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |