Relation: MakBan-Batangas Transmission Line (1407227)
Version #8
[Batangas City] extend Meralco subtransmission lines, add more substation switchgear, 34.5 kV distribution lines, two roadside hotels and related buildings, and power route member roles
- Edited by TagaSanPedroAko
- Changeset #42736652
Tags
Members
8 members
- Way Bay-Batangas 230 kV line (440605006) as line
- Way Bay-Batangas 230 kV line (440605001) as line
- Way 100132773 as line
- Way 100132766 as line
- Way Bay-Batangas 230 kV line (100132769) as line
Way 39422894 as line- Way 440602362 as line
- Way 440602365 as line