-
local survey 25/08/2022 2
-
local survey 25/08/2022
-
local survey 25/08/2022
-
local survey 25/08/2022
-
local survey 23/08/2022 part 3
-
local survey 23/08/2022 part 2
-
local survey 23/08/2022
-
local survey 22/08/2022 part 2
-
local survey 22/08/2022
-
MEI MEIDLING - Grätzloase relocated
-
local survey
-
Modified Bus Stops (new Route since 1.1.22)
-
locAL SURVEY TRAIN STATION
-
Due to construction work The Rosaliagasse Oase is replaced to Rosalia gasse 9
-
New Library - Opened in May 2021 - Added
-
Klima-Grätzl Oase, Built July added
-
Local Survey: Train Platforms Szombathely, Szombathely-Szölös, and Gyöngyöshermán. Train Platforms were built at Gyöngyöshermán and at Szombathely-Szölös
-
Local Survey: Corrected Location of Bus Station
-
Stairs parameters changed
-
local survey footpath added