Loading...
Way: Main Street Southwest (1134059533)
Version #3
Restored portion of Main St which was the Wasena bridge and tagged with roadway under construction, no access, and expected opening date of 2026. Tagged other roads leading to bridge that are part of the construction site as under construction similarly
- Edited by prettyapathetic
- Changeset #150807219
Tags
access | no |
---|---|
bicycle | no |
check_date | 2024-05-02 |
foot | no |
highway | construction |
horse | no |
lane_markings | yes |
lanes | 2 |
lanes:backward | 1 |
lanes:forward | 1 |
maxspeed | 25 mph |
motor_vehicle | no |
name | Main Street Southwest |
opening_date | 2026-01-01 |
parking:lane:both | no |
ref | US 221 |
tiger:cfcc | A21 |
tiger:county | Roanoke-City, VA |
tiger:name_base | Main |
tiger:name_direction_suffix | SW |
tiger:name_type | St |
tiger:reviewed | no |
tiger:zip_left | 24015 |
tiger:zip_right | 24015 |
Part of
4 relations
- Relation Roanoke City Bike Routes (14863399)
- Relation 221 (1283515)
- Relation Third Street Station to Brambleton and Red Rock (12113431)
- Relation Red Rock to Third Street Station (12115449)
Nodes
5 nodes
- 49690709 (part of way Main Street Southwest (6048576))
- 3679615639
- 49690711
- 49690713
- 49690715 (part of ways Main Street Southwest (44016372) and Winona Avenue Southwest (6043238))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |