Loading...
Way: 1136817843
Version #1
Extended HS2 Bromford Tunnel to as under construction east portal
- Edited by BabBabBabBab
- Changeset #131936814
Tags
construction:electrified | contact_line |
---|---|
construction:frequency | 50 |
construction:voltage | 25000 |
construction_eastside | cutting |
construction_westside | cutting |
cutting | yes |
design_line_speed | 200kph |
gauge | 1435 |
highspeed | yes |
maxspeed | 200 |
name:proposed | HS2 |
proposed | rail |
proposed:railway | rail |
railway | construction |
route_version | Route 3 Post Consultation V4 |
source | Department for Transport (DfT) |
updated | 21/11/11 |
usage | main |
Part of
1 relation
Nodes
3 nodes
- 1603688386 (part of way 147164828)
- 1603688631
- 10597141537 (part of way 147160623)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |