Loading...
Way: HS2 (147161363)
Version #9
Added ventilation shaft for Bromford Tunnel
- Edited by BabBabBabBab
- Changeset #144717501
Tags
construction | rail |
---|---|
construction:electrified | contact_line |
construction:frequency | 50 |
construction:railway | rail |
construction:voltage | 25000 |
construction_eastside | cutting |
construction_westside | cutting |
design_line_speed | 230kph |
gauge | 1435 |
highspeed | yes |
layer | -1 |
maxspeed | 230 |
name | HS2 |
note | Alignment adjusted to reflect approx changes for Bromford Lane tunnel (Bored tunnel) |
railway | construction |
route_version | Route 3 Post Consultation V4 (section ammended to reflect Hybrid Bill changes - approx) |
source | Department for Transport (DfT) |
tunnel | yes |
updated | 21/11/11 |
usage | main |
Part of
1 relation
Nodes
2 nodes
- 1603687078 (part of way HS2 (147161439))
- 1603685338 (part of way HS2 (147168900))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |