Loading...
Way: HS2 Phase 1 (147163559)
Version #9
resolve kink in (was proposed, now construction) rail alignment and mismatch to groundworks (tunnel under existing rail) by adjusting to line of tunnel and matching HS2 website
Tags
bridge | viaduct |
---|---|
construction | rail |
construction:electrified | contact_line |
construction:frequency | 50 |
construction:railway | rail |
construction:voltage | 25000 |
design_line_speed | 400kph |
gauge | 1435 |
highspeed | yes |
layer | 1 |
maxspeed | 400 |
name | HS2 Phase 1 |
name:construction | HS2 |
railway | construction |
route_version | Route 3 Post Consultation V4 - Adjusted to actual groundworks and matching HS2 website |
source | Department for Transport (DfT);Bing |
updated | 04/01/12 |
usage | main |
Part of
1 relation
Nodes
2 nodes
- 1603709934 (part of way HS2 Phase 1 (147160217))
- 1603710159 (part of way HS2 Phase 1 (147162884))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |