Loading...
Way: E&N Rail Trail - Humpback Connector (165561020)
Version #12
Added commercial building footprints on Devonshire Road using aerial imagery. Added desire path from Hereward Road to E&N Rail Trail
- Edited by Rockvanteer
- Changeset #140555822
Tags
bicycle | designated |
---|---|
foot | designated |
highway | path |
name | E&N Rail Trail - Humpback Connector |
segregated | no |
surface | paved |
Nodes
8 nodes
- 4403658921 (part of way E&N Rail Trail - Humpback Connector (1159438388))
- 11117524203
- 1771005737
- 4403658920
- 7221496563 (part of way 773665241)
- 11154336954 (part of way 1203274773)
- 3326152864 (part of way 326002449)
- 1771005736 (part of way E&N Rail Trail - Humpback Connector (165561019))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |