Loading...
Way: 24115888
Version #10
Edited NY-135 inbound ramps, edited the proposed Bethpage State Parkway extension to Caumsett and I-287 extension from Rye to NY-135 in Syosset and added the proposed connection to Wantagh State Parkway
- Edited by ThomasBeck31
- Changeset #97546354
Tags
destination | Seaford |
---|---|
destination:ref | NY 135 South |
highway | motorway_link |
lanes | 1 |
oneway | yes |
surface | asphalt |
tiger:cfcc | A63 |
tiger:county | Nassau, NY |
Nodes
21 nodes
- 261351564 (part of way Hempstead Turnpike (139306129))
- 1013085878
- 1013085879
- 261351566
- 261351567
- 261351568
- 261351569
- 261351570
- 261351571
- 261351572
- 261351573
- 261351574
- 261351575
- 261351576
- 261351577
- 261351578
- 261351579
- 1013091223
- 1013091226
- 1013091428
- 1013091139 (part of ways Seaford-Oyster Bay Expressway (87105899) and Seaford-Oyster Bay Expressway (1106837160))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |