Loading...
Way: Zollern-Alb-Bahn (ZAB 1) (27417558)
Version #22
Elektrifizierung Zollern-Alb-Bahn 1 (Abschnitt Tübingen-Bisingen)
Tags
electrified | no |
---|---|
gauge | 1435 |
name | Zollern-Alb-Bahn (ZAB 1) |
operator | DB Netz |
passenger_lines | 1 |
proposed:electrified | contact_line |
proposed:frequency | 16.7 |
proposed:voltage | 15000 |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:traffic_mode | mixed |
ref | 4630 |
start_date | 1878 |
tracks | 1 |
usage | main |
wikipedia | de:Bahnstrecke Tübingen–Sigmaringen |
Part of
8 relations
- Relation RB66: Albstadt => Tübingen (17142890)
- Relation RB66: Sigmaringen => Tübingen (17142891)
- Relation RB66: Tübingen => Albstadt (17142887)
- Relation RB66: Tübingen => Sigmaringen (17142892)
- Relation KBS 766 Aulendorf - Tübingen (1781197)
- Relation 4630 Tübingen Hbf - Sigmaringen (9177820)
- Relation IRE6a: Aulendorf => Stuttgart (17142883)
- Relation IRE6a: Stuttgart => Aulendorf (17142884)
Nodes
15 nodes
- 2926636838 (part of ways Heiligkreuz (155194051), 491591432, Zollern-Alb-Bahn (ZAB 1) (1130739116), and 491591443)
- 4836722018 (part of ways 491591459, Heiligkreuz (155194051), and 491591432)
- 1676115008 (part of ways 491591456, 491591459, and Heiligkreuz (155194051))
- 4836722020 (part of ways 491591456, 491591459, and 491591459)
- 255081634 (part of ways 491591450, 491591450, and 491591456)
- 211531021 (part of ways 155194082, 491571028, 491591450, and 491591456)
- 2926636833
- 255081635
- 2926636834
- 7299171968
- 255081636
- 2926636835
- 267167693
- 2926636836
- 4836550610 (part of way Zollern-Alb-Bahn (ZAB 1) (491571021))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |