Loading...
Way: 40928240
Version #17
SSB Möhringen - Bopser start_date
Tags
description:start_date | Tunnel Möhringen Albstr - Waldau 1990 eröffnet, strecke verlief davor über die Weinsteige |
---|---|
electrified | contact_line |
frequency | 0 |
gauge | 1000;1435 |
layer | -1 |
maxspeed | 55 |
network | VVS |
operator | SSB AG |
railway | light_rail |
railway:pzb | yes |
source:geometry | LGL, www.lgl-bw.de |
start_date | 1990 |
tunnel | yes |
voltage | 750 |
workrules | DE:BOStrab |
Nodes
5 nodes
- 498454506 (part of way 40928223)
- 498454571
- 2279815018
- 2279815019
- 498454576 (part of ways 30015492 and 40928243)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |