Loading...
Way History: Dovrebanen (442941662)
Version #8
Nye dobbeltspor ovder Minnevika bru ble åpnet i søndag
Tags
bridge | yes |
---|---|
bridge:name | Strandheim bru |
electrified | contact_line |
frequency | 16.67 |
gauge | 1435 |
highspeed | yes |
layer | 1 |
maxspeed | 200 |
name | Dovrebanen |
operator | Bane NOR |
railway | rail |
railway:atc | yes |
start_date | 2023-10-15 |
usage | main |
voltage | 15000 |
Nodes
2 nodes
- 4405911382 (part of ways Strandheim bru (442941651) and Dovrebanen (442941673))
- 4405911386 (part of ways Strandheim bru (442941651) and Dovrebanen (442941660))
Version #7
According to Bane NOR, design speed is 200 km/h
Tags
bridge | yes |
---|---|
bridge:name | Strandheim bru |
construction | rail |
construction:electrified | contact_line |
construction:frequency | 16.67 |
construction:gauge | 1435 |
construction:layer | 1 |
construction:railway | rail |
construction:voltage | 15000 |
highspeed | yes |
maxspeed | 200 |
name | Dovrebanen |
opening_date | 2023 |
railway | construction |
usage | main |
Nodes
2 nodes
- 4405911382 (part of ways Strandheim bru (442941651) and Dovrebanen (442941673))
- 4405911386 (part of ways Strandheim bru (442941651) and Dovrebanen (442941660))
Version #6
Lagt inn tagg som mangler: "highspeed=yes"
Tags
bridge | yes |
---|---|
bridge:name | Strandheim bru |
construction | rail |
construction:electrified | contact_line |
construction:frequency | 16.67 |
construction:gauge | 1435 |
construction:layer | 1 |
construction:railway | rail |
construction:voltage | 15000 |
highspeed | yes |
name | Dovrebanen |
opening_date | 2023 |
railway | construction |
usage | main |
Nodes
2 nodes
- 4405911382 (part of ways Strandheim bru (442941651) and Dovrebanen (442941673))
- 4405911386 (part of ways Strandheim bru (442941651) and Dovrebanen (442941660))
Version #5
railway details: 'construction:layer' WHY????
Tags
bridge | yes |
---|---|
bridge:name | Strandheim bru |
construction | rail |
construction:electrified | contact_line |
construction:frequency | 16.67 |
construction:gauge | 1435 |
construction:layer | 1 |
construction:railway | rail |
construction:voltage | 15000 |
name | Dovrebanen |
opening_date | 2023 |
railway | construction |
usage | main |
Nodes
2 nodes
- 4405911382 (part of ways Strandheim bru (442941651) and Dovrebanen (442941673))
- 4405911386 (part of ways Strandheim bru (442941651) and Dovrebanen (442941660))
Version #4
railway details: changed "construction:usage" to "usage"
Tags
bridge | yes |
---|---|
bridge_name | Strandheim bru |
construction:electrified | contact_line |
construction:frequency | 16.67 |
construction:gauge | 1435 |
construction:layer | 1 |
construction:railway | rail |
construction:voltage | 15000 |
name | Dovrebanen |
opening_date | 2023 |
railway | construction |
usage | main |
Nodes
2 nodes
- 4405911382 (part of ways Strandheim bru (442941651) and Dovrebanen (442941673))
- 4405911386 (part of ways Strandheim bru (442941651) and Dovrebanen (442941660))
Version #3
Updating railway lines under construction tags (Gardermoen Line second track, and Dovre Line)
Tags
bridge | yes |
---|---|
bridge_name | Strandheim bru |
construction:electrified | contact_line |
construction:frequency | 16.67 |
construction:gauge | 1435 |
construction:layer | 1 |
construction:railway | rail |
construction:voltage | 15000 |
name | Dovrebanen |
opening_date | 2023 |
railway | construction |
Nodes
2 nodes
- 4405911382 (part of ways Strandheim bru (442941651) and Dovrebanen (442941673))
- 4405911386 (part of ways Strandheim bru (442941651) and Dovrebanen (442941660))
Version #2
Byggestart Eidsvoll til Langset 5. september
Tags
bridge | yes |
---|---|
construction:electrified | contact_line |
construction:frequency | 16.67 |
construction:gauge | 1435 |
construction:layer | 1 |
construction:railway | rail |
construction:voltage | 15000 |
railway | construction |
Nodes
2 nodes
- 4405911382 (part of ways Strandheim bru (442941651) and Dovrebanen (442941673))
- 4405911386 (part of ways Strandheim bru (442941651) and Dovrebanen (442941660))
Version #1
Lagt til planlagt jernbane mellom Eidsvoll og Minnesund.
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 16.67 |
gauge | 1435 |
layer | 1 |
proposed | rail |
railway | proposed |
voltage | 15000 |
Nodes
2 nodes
- 4405911382 (part of ways Strandheim bru (442941651) and Dovrebanen (442941673))
- 4405911386 (part of ways Strandheim bru (442941651) and Dovrebanen (442941660))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |