Loading...
Way: I 10;US 85;US 180 (462886506)
Version #1
Construction of new frontage roads and new bridge connectors, New route for US 85 under construction. All source details found here: http://www.txdot.gov/inside-txdot/projects/studies/el-paso/i10-cd.html
Tags
Nodes
2 nodes
- 4582139911 (part of ways I 10;US 180 (118757380) and Camino Real de Tierra Adentro (462886503))
- 179613365 (part of way Camino Real de Tierra Adentro (118757371))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |