Loading...
Way: 4000 (4699622)
Version #27
rail centering
- Edited by Marc Mongenet
- Changeset #142713953
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
layer | -1 |
maxspeed | 70 |
operator | DB Netz |
owner | Bundeseisenbahnvermögen |
passenger_lines | 2 |
railway | rail |
railway:etcs | 1 |
railway:pzb | yes |
ref | 4000 |
tracks | 1 |
tunnel | yes |
tunnel:name | Tunnel Charlottenfels |
usage | main |
voltage | 15000 |
Part of
6 relations
- Relation Löwenstein (3157552)
- Relation S64: Schaffhausen → Erzingen (Baden) (10947582)
- Relation KBS 730 Hochrheinbahn (288020)
- Relation 4000 Mannheim - Konstanz (4234481)
- Relation 763 (7918518)
- Relation IRE 3 "Sprinter": Ulm -> Basel Bad Bahnhof (10991886)
Nodes
10 nodes
- 29885416 (part of way 4000 (119750506))
- 7304923391
- 1314951722
- 11269232396
- 2427844430
- 11269232394
- 1316429967
- 11269232392
- 1314951791
- 29885418 (part of way 4000 (4699629))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |