Loading...
Way: 524425025
Version #5
GWB south path is closed until 2017 when it will be ped only. Bike routes permanently moved to north path. See https://nyc.streetsblog.org/2023/02/14/today-george-washington-bridge-northern-path-reopens-with-wider-entrance/
- Edited by TheBestIdea
- Changeset #132557541
Tags
Nodes
13 nodes
- 103121480 (part of ways George Washington Bridge (331606363), Hudson Terrace (46593993), Hudson Terrace (1088596791), and Hudson Terrace (46613630))
- 10659833229 (part of way 1145454200)
- 5103463470
- 5103463465
- 7921992363
- 5103463471
- 5103463466
- 7921992345
- 7921992374
- 5103463464
- 5103463463
- 5103463473
- 5103463467 (part of way George Washington Bridge (upper level) (120718209))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |