Loading...
Way: 547246205
Version #5
+fix pedestrian and cycle paths in Parco Nicholas Green
- Edited by WinstonSmith
- Changeset #130335291
Tags
bicycle | designated |
---|---|
bridge | yes |
foot | designated |
highway | cycleway |
layer | 1 |
segregated | yes |
surface | asphalt |
Part of
4 relations
- Relation Bologna-Parco Città Campagna (11148765)
- Relation Ciclovia del Sole (10780965)
- Relation EuroVelo 7 - Sun Route - part Italy 1 (2759974)
- Relation Ciclovia del Sole (2460773)
Nodes
2 nodes
- 3945835435 (part of way 391362672)
- 3331451271 (part of way 1123890944)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |