Loading...
Way: 5620 (570465901)
Version #5
Die Hauptbahn Holzkirchen-Schliersee soll elektrifiziert werden
Tags
electrified | no |
---|---|
gauge | 1435 |
maxspeed:backward | 40 |
maxspeed:forward | 80 |
operator | DB Netz AG |
passenger_lines | 2 |
proposed:electrified | contact_line |
proposed:frequency | 16.7 |
proposed:voltage | 15000 |
railway | rail |
railway:pzb | yes |
ref | 5620 |
source | landsat |
usage | main |
Part of
2 relations
Nodes
7 nodes
- 5484492110 (part of way 5620 (44630943))
- 1505182191 (part of way 44683814)
- 543647652
- 543647658
- 331832750 (part of way Frühlingstraße (1080233983))
- 4737695826
- 30091046 (part of ways 44630955 and 5620 (505018687))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |