Loading...
Way: Kim Keat Link (638062368)
Version #5
roads are heading or coming from a highway, bicycles cannot go onto a highway
Tags
bicycle | no |
---|---|
highway | secondary |
lanes | 3 |
maxspeed | 50 |
name | Kim Keat Link |
oneway | yes |
surface | asphalt |
turn:lanes | left;right|right|right |
Part of
7 relations
- Relation Svc 8 (Tampines Interchange → Toa Payoh Interchange) (1147259)
- Relation Svc 59 (Changi Village Terminal → Bishan Interchange) (6623058)
- Relation Svc 142 (Roundtrip from Toa Payoh Interchange) (1153767)
- Relation Svc 26 (Bedok Interchange → Toa Payoh Interchange) (1147972)
- Relation Svc 31 (Tampines Interchange → Toa Payoh Interchange) (1148695)
- Relation Svc 506 (Serangoon Interchange → Jurong East Interchange) (6623049)
- Relation Svc 90 (Roundtrip from Toa Payoh Interchange) (1152140)
Nodes
2 nodes
- 391256267 (part of ways 34127223 and 159676515)
- 6014246561 (part of way Kim Keat Link (465043179))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |