Loading...
Way: B 305 (76168900)
Version #25
Baustelle Samerbrücke bis Dezember
Tags
access:conditional | no @ (2023 May 02-2023 Dec 15) |
---|---|
alt_name | Weinkaser |
cycleway:both | no |
highway | primary |
incline | 11% |
lanes | 2 |
maxspeed:backward | 50 |
maxspeed:forward | 70 |
oneway | no |
ref | B 305 |
shoulder | no |
sidewalk | no |
surface | asphalt |
tmc | DE:22896/22897 |
Nodes
18 nodes
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |