Loading...
Way History: Caltrain Peninsula Subdivision (826634042)
Version #7
Add PTC.
- Edited by ISTJ-T 1w9
- Changeset #150544365
Tags
electrified | contact_line |
---|---|
frequency | 60 |
gauge | 1435 |
maxspeed | 79 mph |
maxspeed:freight | 45 mph |
name | Caltrain Peninsula Subdivision |
operator | Peninsula Corridor Joint Powers Board |
operator:wikidata | Q107126073 |
owner | Peninsula Corridor Joint Powers Board |
railway | rail |
railway:ptc | yes |
railway:track_ref | 1 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1342758674 (part of ways 119525089 and Caltrain Peninsula Subdivision (826634043))
- 1342758584 (part of way Caltrain Peninsula Subdivision (639288350))
Version #6
Caltrain: OCS completed and energized
- Edited by astro_furball
- Changeset #150238219
Tags
electrified | contact_line |
---|---|
frequency | 60 |
gauge | 1435 |
maxspeed | 79 mph |
maxspeed:freight | 45 mph |
name | Peninsula Subdivision |
operator | Peninsula Corridor Joint Powers Board |
operator:wikidata | Q107126073 |
owner | Peninsula Corridor Joint Powers Board |
railway | rail |
railway:track_ref | 1 |
tiger:cfcc | B11 |
tiger:county | San Mateo, CA |
tiger:name_base | Union Pacific Railroad |
tiger:name_base_1 | Joint Powers Authority RR |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1342758674 (part of ways 119525089 and Caltrain Peninsula Subdivision (826634043))
- 1342758584 (part of way Caltrain Peninsula Subdivision (639288350))
Version #5
add operator:wikidata=Q107126073 to Peninsula Corridor JPB trackage
Tags
construction:electrified | contact_line |
---|---|
construction:frequency | 60 |
construction:voltage | 25000 |
electrified | no |
gauge | 1435 |
maxspeed | 79 mph |
maxspeed:freight | 45 mph |
name | Peninsula Subdivision |
operator | Peninsula Corridor Joint Powers Board |
operator:wikidata | Q107126073 |
owner | Peninsula Corridor Joint Powers Board |
railway | rail |
railway:track_ref | 1 |
tiger:cfcc | B11 |
tiger:county | San Mateo, CA |
tiger:name_base | Union Pacific Railroad |
tiger:name_base_1 | Joint Powers Authority RR |
usage | main |
Nodes
2 nodes
- 1342758674 (part of ways 119525089 and Caltrain Peninsula Subdivision (826634043))
- 1342758584 (part of way Caltrain Peninsula Subdivision (639288350))
Version #4
remove track number from name
Tags
construction:electrified | contact_line |
---|---|
construction:frequency | 60 |
construction:voltage | 25000 |
electrified | no |
gauge | 1435 |
maxspeed | 79 mph |
maxspeed:freight | 45 mph |
name | Peninsula Subdivision |
operator | Peninsula Corridor Joint Powers Board;Union Pacific Railroad |
owner | Peninsula Corridor Joint Powers Board |
railway | rail |
railway:track_ref | 1 |
tiger:cfcc | B11 |
tiger:county | San Mateo, CA |
tiger:name_base | Union Pacific Railroad |
tiger:name_base_1 | Joint Powers Authority RR |
usage | main |
Nodes
2 nodes
- 1342758674 (part of ways 119525089 and Caltrain Peninsula Subdivision (826634043))
- 1342758584 (part of way Caltrain Peninsula Subdivision (639288350))
Version #3
electrification under construction
- Edited by xephos1one
- Changeset #102750174
Tags
construction:electrified | contact_line |
---|---|
construction:frequency | 60 |
construction:voltage | 25000 |
electrified | no |
gauge | 1435 |
maxspeed | 79 mph |
maxspeed:freight | 45 mph |
name | Peninsula Subdivision MT1 |
operator | Peninsula Corridor Joint Powers Board;Union Pacific Railroad |
owner | Peninsula Corridor Joint Powers Board |
railway | rail |
railway:track_ref | 1 |
tiger:cfcc | B11 |
tiger:county | San Mateo, CA |
tiger:name_base | Union Pacific Railroad |
tiger:name_base_1 | Joint Powers Authority RR |
usage | main |
Nodes
2 nodes
- 1342758674 (part of ways 119525089 and Caltrain Peninsula Subdivision (826634043))
- 1342758584 (part of way Caltrain Peninsula Subdivision (639288350))
Version #2
restoring Peninsula Subdivision to usage=main (reverting own changes)
Tags
electrified | no |
---|---|
gauge | 1435 |
maxspeed | 79 mph |
maxspeed:freight | 45 mph |
name | Peninsula Subdivision MT1 |
operator | Peninsula Corridor Joint Powers Board;Union Pacific Railroad |
owner | Peninsula Corridor Joint Powers Board |
railway | rail |
railway:track_ref | 1 |
tiger:cfcc | B11 |
tiger:county | San Mateo, CA |
tiger:name_base | Union Pacific Railroad |
tiger:name_base_1 | Joint Powers Authority RR |
usage | main |
Nodes
2 nodes
- 1342758674 (part of ways 119525089 and Caltrain Peninsula Subdivision (826634043))
- 1342758584 (part of way Caltrain Peninsula Subdivision (639288350))
Version #1
adding railway:maxspeed:diverging=* to switches
Tags
electrified | no |
---|---|
gauge | 1435 |
maxspeed | 79 mph |
maxspeed:freight | 45 mph |
name | Peninsula Subdivision MT1 |
operator | Peninsula Corridor Joint Powers Board;Union Pacific Railroad |
owner | Peninsula Corridor Joint Powers Board |
railway | rail |
railway:track_ref | 1 |
tiger:cfcc | B11 |
tiger:county | San Mateo, CA |
tiger:name_base | Union Pacific Railroad |
tiger:name_base_1 | Joint Powers Authority RR |
usage | branch |
Nodes
2 nodes
- 1342758674 (part of ways 119525089 and Caltrain Peninsula Subdivision (826634043))
- 1342758584 (part of way Caltrain Peninsula Subdivision (639288350))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |