Loading...
Way: Kim Keat Link (827218852)
Version #3
roads are heading or coming from a highway, bicycles cannot go onto a highway
Tags
bicycle | no |
---|---|
highway | secondary |
lanes | 1 |
maxspeed | 50 |
name | Kim Keat Link |
oneway | yes |
sidewalk | left |
surface | asphalt |
turn:lanes | left;through |
Part of
9 relations
- Relation Svc 8 (Toa Payoh Interchange → Tampines Interchange) (6623079)
- Relation Svc 59 (Bishan Interchange → Changi Village Terminal) (1149524)
- Relation Svc 142 (Roundtrip from Toa Payoh Interchange) (1153767)
- Relation Svc 142A (Toa Payoh Interchange → Sant Ritz) (12980591)
- Relation Svc 506 (Jurong East Interchange → Serangoon Interchange) (2689297)
- Relation Svc 26 (Toa Payoh Interchange → Bedok Interchange) (6623019)
- Relation Svc 31 (Toa Payoh Interchange → Tampines Interchange) (6623028)
- Relation Svc 90 (Roundtrip from Toa Payoh Interchange) (1152140)
- Relation Svc 90A (Toa Payoh Interchange → Paya Lebar Air Base) (12980709)
Nodes
3 nodes
- 391253965 (part of way Kim Keat Link (639549729))
- 8073354695 (part of way 866156604)
- 391280053 (part of ways 159676516 and 866157187)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |