Loading...
Way History: 東區走廊 Island Eastern Corridor (915917669)
Version #4
HKI road updates
Tags
bridge | viaduct |
---|---|
bridge:name | 東區走廊 Island Eastern Corridor |
bridge:name:en | Island Eastern Corridor |
bridge:name:zh | 東區走廊 |
covered | partial |
covered:left | full |
covered:right | partial |
destination:lanes | Tin Hau; Causeway Bay|Happy Valley; Kowloon (C)|Happy Valley; Kowloon (C)|Central; Kowloon (W) |
destination:lang:en:lanes | Tin Hau; Causeway Bay|Happy Valley; Kowloon (C)|Happy Valley; Kowloon (C)|Central; Kowloon (W) |
destination:lang:zh:lanes | 天后;銅鑼灣|跑馬地;九龍(中)|跑馬地;九龍(中)|中區;九龍(西) |
destination:symbol:lanes | no|tunnel|tunnel|tunnel;airport |
destination:to:aeroway:lanes | no|no|no|aerodrome |
destination:to:motorroad:lanes | no|yes|yes|yes |
destination:to:motorroad:tunnel:lanes | no|yes|yes|yes |
highway | motorway |
insulation | soundproof |
insulation:left | soundproof |
insulation:left:structure | separate |
insulation:right | no |
lanes | 4 |
lanes:start_date | 2021-08-15 |
layer | 2 |
maxspeed | 70 |
name | 東區走廊 Island Eastern Corridor |
name:en | Island Eastern Corridor |
name:zh | 東區走廊 |
noref | yes |
oneway | yes |
roof | separate |
shoulder | no |
surface | asphalt |
turn:lanes | slight_left|through|through|through |
wall:left | separate |
was:lanes | 3 |
was:lanes:end_date | 2021-08-15 |
Nodes
2 nodes
- 8507558462 (part of ways 東區走廊 Island Eastern Corridor (253999311), 東區走廊 Island Eastern Corridor (915917671), 東區走廊 Island Eastern Corridor (915917671), 東區走廊 Island Eastern Corridor (915917672), and 915917673)
- 4791936462 (part of ways 東區走廊 Island Eastern Corridor (486609006), 東區走廊 Island Eastern Corridor (915917672), 東區走廊 Island Eastern Corridor (915917672), 東區走廊 Island Eastern Corridor (915917675), and 915917679)
Version #3
IEC road structures
Tags
bridge | viaduct |
---|---|
bridge:name | 東區走廊 Island Eastern Corridor |
bridge:name:en | Island Eastern Corridor |
bridge:name:zh | 東區走廊 |
check_date | 2021-02 |
construction:lanes | 4 |
construction:proposed:start_date | 2021 |
construction:shoulder:left | no |
covered | partial |
covered:left | full |
covered:right | partial |
destination:lanes | 銅鑼灣 Causeway Bay|九龍 Kowloon|中區 Central |
highway | motorway |
insulation | soundproof |
insulation:left | soundproof |
insulation:left:structure | separate |
insulation:right | no |
lanes | 3 |
layer | 2 |
maxspeed | 70 |
name | 東區走廊 Island Eastern Corridor |
name:en | Island Eastern Corridor |
name:zh | 東區走廊 |
noref | yes |
oneway | yes |
roof | separate |
shoulder | no |
shoulder:left | construction |
surface | asphalt |
wall:left | separate |
Nodes
2 nodes
- 8507558462 (part of ways 東區走廊 Island Eastern Corridor (253999311), 東區走廊 Island Eastern Corridor (915917671), 東區走廊 Island Eastern Corridor (915917671), 東區走廊 Island Eastern Corridor (915917672), and 915917673)
- 4791936462 (part of ways 東區走廊 Island Eastern Corridor (486609006), 東區走廊 Island Eastern Corridor (915917672), 東區走廊 Island Eastern Corridor (915917672), 東區走廊 Island Eastern Corridor (915917675), and 915917679)
Version #2
IEC road structures
Tags
bridge | viaduct |
---|---|
bridge:name | 東區走廊 Island Eastern Corridor |
bridge:name:en | Island Eastern Corridor |
bridge:name:zh | 東區走廊 |
check_date | 2021-02 |
construction:lanes | 4 |
construction:proposed:start_date | 2021 |
construction:shoulder:left | no |
covered | yes |
destination:lanes | 銅鑼灣 Causeway Bay|九龍 Kowloon|中區 Central |
highway | motorway |
insulation | soundproof |
insulation:left | soundproof |
insulation:left:structure | separate |
insulation:right | no |
lanes | 3 |
layer | 2 |
maxspeed | 70 |
name | 東區走廊 Island Eastern Corridor |
name:en | Island Eastern Corridor |
name:zh | 東區走廊 |
noref | yes |
oneway | yes |
roof | separate |
shoulder | no |
shoulder:left | construction |
surface | asphalt |
wall:left | separate |
Nodes
2 nodes
- 8507558462 (part of ways 東區走廊 Island Eastern Corridor (253999311), 東區走廊 Island Eastern Corridor (915917671), 東區走廊 Island Eastern Corridor (915917671), 東區走廊 Island Eastern Corridor (915917672), and 915917673)
- 4791936462 (part of ways 東區走廊 Island Eastern Corridor (486609006), 東區走廊 Island Eastern Corridor (915917672), 東區走廊 Island Eastern Corridor (915917672), 東區走廊 Island Eastern Corridor (915917675), and 915917679)
Version #1
IEC road structures
Tags
bridge | viaduct |
---|---|
check_date | 2021-02 |
construction:lanes | 4 |
construction:proposed:start_date | 2021 |
construction:shoulder:left | no |
covered | yes |
destination:lanes | 銅鑼灣 Causeway Bay|九龍 Kowloon|中區 Central |
highway | motorway |
insulation | soundproof |
insulation:both | separate |
lanes | 3 |
layer | 2 |
maxspeed | 70 |
name | 東區走廊 Island Eastern Corridor |
name:en | Island Eastern Corridor |
name:zh | 東區走廊 |
noref | yes |
oneway | yes |
roof | separate |
shoulder | no |
shoulder:left | construction |
surface | asphalt |
Nodes
2 nodes
- 8507558462 (part of ways 東區走廊 Island Eastern Corridor (253999311), 東區走廊 Island Eastern Corridor (915917671), 東區走廊 Island Eastern Corridor (915917671), 東區走廊 Island Eastern Corridor (915917672), and 915917673)
- 4791936462 (part of ways 東區走廊 Island Eastern Corridor (486609006), 東區走廊 Island Eastern Corridor (915917672), 東區走廊 Island Eastern Corridor (915917672), 東區走廊 Island Eastern Corridor (915917675), and 915917679)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |