Loading...
Way: Point Mallard Parkway Southeast (957764781)
Version #3
AL 67 updates
Tags
NHS | yes |
---|---|
hgv | designated |
hgv:national_network | yes |
highway | primary |
lanes | 4 |
lanes:backward | 2 |
lanes:forward | 2 |
maxspeed | 55 mph |
name | Point Mallard Parkway Southeast |
ref | AL 67 |
source:hgv:national_network | Title 23: Highways Part 658 http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&rgn=div5&view=text&node=23:1.0.1.7.33&idno=23 |
surface | asphalt |
tiger:name_direction_suffix | SE |
tiger:zip_left | 35603 |
tiger:zip_right | 35603 |
Part of
1 relation
- Relation 67 (1534507)
Nodes
5 nodes
- 4772212130 (part of ways Upper River Road (7940347) and Point Mallard Parkway Southeast (957764786))
- 59042439
- 59042440
- 59042442
- 8862199158 (part of way Point Mallard Parkway Southeast (957764780))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |