Loading...
Way: 200 (988872042)
Version #23
update progress
- Edited by RobertH-PUM
- Changeset #146953539
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:ASTALDI / THALES,progress:87.80%/31.01.2024 88.25%/21.12.2023 82.44%/01.12.2022 70.12%/15.11.2021 53.3%/23.12.2020 |
usage | main |
voltage | 25000 |
Part of
6 relations
- Relation EN 347: Wien - Bucuresti (8739058)
- Relation EN 346: Bucuresti - Wien (3299267)
- Relation Trasee vechi tronsonul 2B(Barzava - Ilteu) (9401900)
- Relation Reabilitarea Subtronsonuluii 2B(Barzava - Ilteu) (9403568)
- Relation Reabilitarea Subtronsonuluii 2B(Barzava - Ilteu) -neterminat (12887302)
- Relation Secția 200 Brașov - Curtici (3430966)
Nodes
2 nodes
- 9139903430 (part of way 200 (1007498557))
- 9139903429 (part of way 200 (677279881))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |