Changeset: 47818893
[Sucat, Muntinlupa/NGCP transmission system/Meralco subtransmission and distribution system] retag 230 kV tie lines actually used for 115 kV and switchgear on former switchyard, now used as Meralco substation, add old name of Sucat Thermal Power Plant
Closed by TagaSanPedroAko
Tags
created_by | iD 2.1.3 |
---|---|
host | http://www.openstreetmap.org/id |
imagery_used | Bing aerial imagery |
locale | en-US |
Discussion
-
Comment from TagaSanPedroAko
Former switchyard for Sucat Thermal Power Plant now Meralco 115 kV-34.5 kV distribution substation (Gardner Substation), if looking at existing imagery from Bing and Mapbox. 115 kV tie lines need to be adjusted or extended later. Sucat (Muntinlupa) - Biñan Transmission Line may be originally rated at 115 kV and connected to the 115 kV side of Biñan Substation.
Ways (16)
- Sucat - Binan Transmission Line (487017044), v1
- 487017045, v1
- Gardner Substation (441813417), v2
- NGCP Muntinlupa - Gardner Tie Line (441813432), v7
- Sucat - Binan Transmission Line (469036515), v3
- NGCP Muntinlupa - Gardner Tie Line (443997066), v3
- 469395115, v2
- Sucat Thermal Power Plant (4914066), v9
- NGCP Muntinlupa - Gardner Tie Line (469395118), v2
- 469395119, v2
- 469395114, v2
- 469395116, v2
- 469395111, v2
- 469395120, v2
- 441813431, v3
- Sucat Thermal Power Plant (34129164), v12
Relations (1)
Nodes (1)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |