Loading...
Changeset: 57981306
Checked, and this part of the future Sovetsk/Panemunė bypass isn't over yet. It is scheduled to be over in 2019. It is ready on the Lithuanian side though.
Closed by Jay May
Tags
changesets_count | 6042 |
---|---|
created_by | iD 2.7.1 |
host | https://www.openstreetmap.org/edit |
imagery_used | DigitalGlobe Standard Imagery |
locale | pl |
Discussion
-
Comment from Tomas Straupis
highway=construction
says that it is a construction site.
construction=trunk/primary
says that after construction is done, it will be a highway=trunk/primary road.
So it is not necessary to remove construction=xxx tag from roads which are under construction.
Ways (7)
- 578607075, v1
- 578607076, v1
- 578607077, v1
- 578607078, v1
- 27А-004 (578607079), v1
- 27А-004 (150175368), v11
- 27А-004 (539472335), v5
Relations (1)
Nodes (1-20 of 22)
- 1
- 2
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |