1. Updated parking lots and construction areas north of Allianz Field consistent with Minnesota United web site.

    Closed · #74018079
    0
  2. Adjusted street connections on Simpson Street and Spruce Tree Avenue variations between site plan and personal observations of site.

    Closed · #69249679
    0
  3. Added stoplights near, and utility tunnel into, soccer stadium.

    Closed · #69192481
    0
  4. Stadium opening day is April 13, 2019. Updated Allianz Field area in accordance with team's web site.

    Closed · #69167964
    0
  5. On Feb. 27, 2019, Minnesota United announced that the construction of Allianz Field in the Midway area of Saint Paul is now complete, and the stadium has been turned over to the Club from Mortenson, the project’s Construction Manager.

    Closed · #67690146
    0
  6. Although the surrounding stadium building remains under construction, the sod has been laid for the pitch. The pitch, therefore, seems now to be subject to routine maintenance, rather than construction, and the "construction" landuse tag seems obsolete.

    Closed · #63979371
    0
  7. Spruce Tree Avenue no longer crosses Snelling Avenue. The crossing is now blocked by a new Snelling Avenue median and the stoplights have been removed.

    Closed · #63656744
    0
  8. Extended Central Avenue (under construction) from North Asbury Street (under construction) to Snelling Avenue. (This was not done previously as it had conflicted with existing building, which was recently razed as part of the construction project.)

    Closed · #62617323
    1
  9. This building just has been razed and is therefore deleted.

    Closed · #62554050
    0
  10. Because liquor store is now sole building occupant, deleted Liquor Store node, converted building to Liquor Store.

    Closed · #62414804
    0
  11. Move Big Top Liquors to former Perkins restaurant building.

    Closed · #62414737
    0
  12. Added under-construction sidewalks north of Shields Ave. Tagged lot to be sodded as grass under construction. Tagged Shields Ave. north of stadium as "living street," as it will be paved like a plaza, have bollards, and be able to be made pedestrian-only.

    Closed · #59953609
    0
  13. Returned bus stops, wandering in the middle of the street, safely to the curb.

    Closed · #59886625
    0
  14. Updated pedestrian access to front of Capitol post-renovation.

    Closed · #59884365
    0
  15. From 6/30/17 Allianz Field construction documents, named Central Avenue to the west of the stadium and reconfigured parking area to the north. Omitted construction tags on future service roads and parking aisles, all currently behind construction fencing.

    Closed · #59881477
    0
  16. Further refinements to shape and location of Allianz Field MLS stadium and boundary of Metro Transit lot based on preliminary plat diagram.

    Closed · #59818840
    0
  17. Added under-construction streets and green space north of Allianz Field MLS stadium. Names and locations per Final Plat for the Snelling-Midway Redevelopment Site.

    Closed · #59787100
    0
  18. Added under-construction streets surrounding Allianz Field MLS stadium. Construction of stadium is in progress.

    Closed · #59759524
    0
  19. Deleted vestigial western boundary of former parking lot. (Minor edit.)

    Closed · #59321747
    0
  20. Added tags to field and added relation to stadium

    Closed · #59286232
    0