1. Fixed the cycling path curve next to the new bridge

    Closed · #148709018
    0
  2. Removed dismounted track, it will never come back as the other tracks will be moved to reduce the curve + increased the length of a track under construction that was prolongated to after the new bridge

    Closed · #148708790
    0
  3. Removed dismounted track, it will never come back as the other tracks will be moved to reduce the curve

    Closed · #148707648
    0
  4. Add new elevator that is in service since end december 2023

    Closed · #148114147
    0
  5. Tracks have been moved in april 2022 to extend the old bridge and put 2 more later

    Closed · #143757317
    0
  6. Construction of the new bridge is done and the road is back it's normal way.

    Closed · #142891549
    0
  7. Modified storm basin and surrounding farmland that was cut for the roundabout under construction

    Closed · #142297126
    0
  8. Fix size of residential zone that is cute for the future railway tracks

    Closed · #142296915
    0
  9. More accurate position of future railway tracks

    Closed · #142296305
    0
  10. Add kick scooter dropzone

    Closed · #142216766
    3
  11. Add position of future tracks in Lillois over the school sport court and parking that will be demolished

    Closed · #141882537
    0
  12. Add tracks under construction in Lillois

    Closed · #141882001
    0
  13. Add railway tracks under construction on the new railway platform between Baulers and Lillois. The Flying Junction will need to be added at a later time between chee de Bruxelles and rue de l'Epine Pucelle

    Closed · #141880352
    0
  14. Add railway tracks under construction on the new railway platform between Baulers and Lillois. The Flying Junction will need to be added at a later time between chee de Bruxelles and rue de l'Epine Pucelle

    Closed · #141879637
    0
  15. Set part of railway track that will be demolished soon as disused

    Closed · #141876851
    0
  16. Add railway tracks under construction on the new railway platform between Baulers and Lillois. The Flying Junction will need to be added at a later time between chee de Bruxelles and rue de l'Epine Pucelle

    Closed · #141874001
    0
  17. Add tags to elevators

    Closed · #141870559
    0
  18. Move stairs and cambio station to correct place on the map + set elevator to construction phase, it is not there yet, only the elevator shaft is already built

    Closed · #141870272
    0
  19. Set PMR spots tag

    Closed · #141869958
    0
  20. Add parking spots

    Closed · #141869918
    0
Load more
Loading...