-
Updated proposed crossing to open, having used it on 7/12/22.
-
Adding in changes as building work continues. Cycle track basically complete but fenced off in Dec 2022. NB area set to be filtered in early 2023 https://www.southwark.gov.uk/assets/attach/147770/Westmoreland-Road-trial-closure-notice-dated-24-Nov-2022-.p
-
Changes status to private: cyclestreets tried to route me here but there was a locked gate with no right of way sign on one side. While on other just a footpath.
-
Added this scheme which is largley in situ, due to be completed by end of May 2022. Should be 2-way cycle track (technically protected 2-way lane) on north side of Druid Street. https://consultations.southwark.gov.uk/environment-leisure/druid-st/
-
Added cycle contraflow & corrected street type
-
filter is now live
-
Removed non existent cycle route - the recent scheme (which I proposed & successfully got funding for) was just to allow two-way cycling.
-
Cycle track removed as part of adjacent Elephant Park redevelopment and new planting. No signs even indicating shared use.
-
Added in #streetspace filter
-
Added in #streetspace filter
-
Added in #streetspace filter
-
added cycle access - no signs on street prohibiting
-
Remove cycle access from closed bridged
-
adding in cycle access around Scylla Road.
-
removing non-existent cycle route
-
Tidying up non-existent cycle routes, COVID bollard changes etc.
-
corrected new development access (no home zone designation so not living street)
-
Added cycle link delivered through Artichoke Place reconstruction, and tweaked street alignment
-
missing bit of contraflow
-
added contraflow cycling (in force from 6 August 2020) plus pedestrianisation