-
The bridge has been demolished and this section is not permanently closed (no more crossing the 401). A new bridge has been built about 300 m to the Northeast on new Tremaine Road North.
Closed
-
New Tremaine Road is now open, and the new bridge over the 401 is open too,
Closed
-
This new road and bridge are now open
Closed
-
The bridge has been demolished and this section is not permanently closed (no more crossing the 401). A new bridge has been built about 300 m to the Northeast on new Tremaine Road North.
Closed