Closed changes on CM 1158. Surfaces updated on Aldeia da Ribeira Fundeira
Rotate reservoir to match real alignment. Position and size may still be inaccurate.
Tagged ventilation shaft of Aqueduto das Águas Livres
Added ventilation shafts from Aqueduto das Águas Livres
Set CV1-20 with Asphalt surface
Redo node, provide CM1158 ref and added naming
Split CM1158 and naming for the 3 roads
Slight alignment of CM1158 to the road geometric center.
Rectify CM1158 path and node with Estrada do Maxial da Carreira