1. Stops were moved back after roundabout construction.

    Closed
    #175128381 0 1 0 0
  2. Oops, there's a rubbish bin there.

    Closed
    #173908200 0 1 0 0
  3. Adding missing 60 Port Edward shop

    Closed
    #173908179 1 0 0 0
  4. Adding the stops to 57 Combo - Transition House route (yay, all the stops were already done)

    Closed
    #173855538 0 1 0 0
  5. Adding the stops to 55 Fairview Bay. Done.

    Closed
    #173775836 0 1 0 0
  6. I am well aware that this is on 3rd Avenue and not 7th Street. That's what they call the stop when I was riding the bus, though. ¯\_ (ツ)_/¯

    Closed
    #173775703 0 1 0 0
  7. Road order fixed for 55 Fairview Bay. One stop to adjust, then add all those in.

    Closed
    #173775682 0 1 0 0
  8. Adding in the doubled parts of 55 Fairview Bay

    Closed
    #173775533 0 1 0 0
  9. Splitting the road to better map the bus route.

    Closed
    #173775405 1 3 0 0
  10. Reordering route 55 Fairview Bay. Some sections still missing.

    Closed
    #173775337 0 1 0 0
  11. Removing an extra section of 55 Fairview Bay

    Closed
    #173775098 0 1 0 0
  12. Adding actual route of 55 Fairview Bay

    Closed
    #173775074 0 1 0 0
  13. Ah, the road segment goes through that intersection. I'll leave that bit in then.

    Closed
    #173774998 0 1 0 0
  14. Removing sections not used by 55 Fairview Bay

    Closed
    #173774960 0 1 0 0
  15. Adding actual route of 55 Fairview Bay

    Closed
    #173774944 0 1 0 0
  16. Removing sections from 55 Fairview Bay

    Closed
    #173774910 0 1 0 0
  17. Removing sections from 55 Fairview Bay

    Closed
    #173774889 0 1 0 0
  18. Adjusting the route of 55 Fairview Bay

    Closed
    #173774863 0 1 0 0
  19. Removing sections from 55 Fairview Bay

    Closed
    #173774833 0 1 0 0
  20. Remove from 55 Fairview Bay

    Closed
    #173774801 0 1 0 0