Loading...
Way: Autostrada Prieteniei (1020073173)
Version #1
A5 Motorway Lot 1 finished, complete by 2024?
- Edited by Strabag Greg Renkus
- Changeset #115994422
Tags
access | no |
---|---|
description | Drum de legatura DN5 - Podul Prieteniei |
highway | motorway |
int_ref | E 70;E 85 |
lanes | 2 |
maxspeed | 100 |
name | Autostrada Prieteniei |
oneway | yes |
ref | A5 |
smoothness | excellent |
start_date | 2021 |
status | AC,AM,builder:PORR,progress:93.59%/15.12.2021 66.10%/13.10.2021 8.26%/15.12.2020 7.23%/01.11.2020,finacing:POIM |
surface | concrete |
surface_survey | 2021DEC_RobertH@peundemerg.ro |
Nodes
2 nodes
-
9408233600 - 9197287013 (part of way Centura Giurgiu (1001915674))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |