Loading...
Way: Galleria Artificiale Baglio (164640444)
Version #12
Aggiornamento aree di cantiere
Tags
access | no |
---|---|
construction | motorway |
highway | construction |
int_ref | E 90 |
lanes | 2 |
layer | -1 |
length | 44 |
lit | 24/7 |
maxspeed | 130 |
name | Galleria Artificiale Baglio |
oneway | yes |
overtaking:hgv | no |
ref | A20 |
shoulder | no |
surface | asphalt |
toll | yes |
tunnel | yes |
Part of
2 relations
- Relation Autostrada A20 Messina-Palermo (148180) (as forward)
- Relation Strada europea E 90 (2048360) (as forward)
Nodes
3 nodes
- 31129075 (part of way Autostrada Messina-Palermo (60141970))
- 1762521091
- 1661510794 (part of way Autostrada Messina-Palermo (153480060))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |