Loading...
Way: 243639233
Version #9
Ramp closure for 6 months for construction of new tunnel
- Edited by Thomas Jarvis
- Changeset #130926872
Tags
access | no |
---|---|
highway | primary_link |
lanes | 1 |
maxspeed | 30 mph |
note | Due to new cycle/walking/bus route being constructed between Jan-Jul 23. The exit ramp and some other roads will be closed |
oneway | yes |
sidewalk | none |
surface | asphalt |
Part of
2 relations
- Relation 14B Peacehaven → Brighton Station (12832861)
- Relation A259 (11870780)
Nodes
11 nodes
- 2463791208 (part of way 238556535)
- 2463791223
- 26835151
- 2463791200
- 26835152
- 26835153
- 2463791215
- 26835154
- 2463791193 (part of way 243639246)
- 8608824800
- 4145570177 (part of ways Marine Drive (756767496) and Marine Drive (834232807))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |