Loading...
Way: 85585707
Version #8
bridge was not labeled usage = main even though tracks on both sides are labeled usage = main. Therefore I changed the usage labeling of the bridge section to "main"
- Edited by kelphilipp
- Changeset #148956370
Tags
axle_load | 22.5 |
---|---|
bridge | yes |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 90 |
railway | rail |
railway:etcs | no |
usage | main |
voltage | 25000 |
Nodes
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |