Loading...
Way: 87104114
Version #6
Construction on Mendota Bridge sidewalk
Tags
bicycle | designated |
---|---|
bridge | yes |
construction | cycleway |
foot | designated |
highway | construction |
layer | 1 |
note | Supposedly finished in November 2024 |
segregated | no |
surface | paved |
Part of
2 relations
- Relation Mississippi River Trail (Minnesota-Alternate) (3365974)
- Relation 45A (15754250)
Nodes
13 nodes
- 1013045531 (part of ways 87104110 and Mendota Bridge (377628570))
- 1668236952
- 1668236953
- 1668236936
- 1668236934
- 1668236948
- 1668236943
- 1668236947
- 1668236956
- 1668236941
- 1668236937
- 1668236945
- 1013045541 (part of ways Mendota Bridge (377628570) and 87104112)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |