Loading...
Way: Baulandstraße (93243655)
Version #13
Vollsperrung zwischen Finkenstraße und Lochfeldstraße (21. bis 30. Mai 2024)
- Edited by linux-user
- Changeset #151729866
Tags
access:conditional | no @ (2024 May 21 - 2024 May 30) |
---|---|
cycleway:both | no |
highway | tertiary |
lanes | 2 |
maxspeed | 50 |
maxweight | 7.5 |
name | Baulandstraße |
ref | K 3716 |
surface | asphalt |
Part of
2 relations
- Relation Badische Spargelstraße (299337)
- Relation K 3716 (2778688)
Nodes
11 nodes
- 27204639 (part of way Baulandstraße (1217461668))
- 503425026 (part of way 41204229)
- 1049399151
- 503425036 (part of way 195156585)
- 27204640
- 503425031
- 503425007 (part of way 592345268)
- 3188337903 (part of way 312914335)
- 503425033
- 558518619
- 558518618 (part of way Baulandstraße (93243667))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |