Loading...
Way: Nürnberg–Bamberg (25434272)
Version #20
Gleisverschwenkung und neue Bahnhofshälfte eingetragen, Baiersdorf-Forchheim
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
name | Nürnberg–Bamberg |
operator | DB Netz AG |
passenger_lines | 4 |
railway | rail |
railway:pzb | yes |
ref | 5900 |
usage | main |
voltage | 15000 |
Part of
7 relations
- Relation S-Bahn S1: Neumarkt (Oberpf) => Forchheim (Oberfr.) (17013074)
- Relation 5900 Nürnberg - Bamberg (7690349)
- Relation S-Bahn S1: Neumarkt (Oberpf) => Bamberg (17013061)
- Relation S-Bahn S1: Neumarkt (Oberpf) => Erlangen (17013075)
- Relation S-Bahn S1: Nürnberg Hauptbahnhof => Erlangen (539312)
- Relation S-Bahn S1: Nürnberg Hauptbahnhof => Bamberg (10466929)
- Relation S-Bahn S1: Nürnberg Hauptbahnhof => Forchheim (Oberfr.) (10452380)
Nodes
3 nodes
- 25646403 (part of ways Nürnberg–Bamberg (25432647) and 370079291)
- 2775 (3736153991) (part of way 32609062)
- 366692603 (part of ways Nürnberg–Bamberg (370307750) and 32609061)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |