Added what type of company is Meralco and National Grid Corporation of the Philippines (NGCP), and added ownership=public if a node of a power lines structure has owner=National Transmission Corporation.
Tags
cables | 3 |
---|---|
circuits | 1 |
frequency | 60 |
name | NGCP Muntinlupa - Gardner Tie Line |
operator | Meralco |
operator:type | private |
operator:wikidata | Q6817918 |
operator:wikipedia | en:Meralco |
power | line |
source | Bing;Yahoo |
voltage | 115000 |
wires | double |
Nodes
3 nodes
- SPA-6 (4795414382) (part of ways Manila-Muntinlupa 230 kV line (592575456) and Manila-Muntinlupa 230 kV line (799749777))
- 4414992262
- 4414992263 (part of ways 469395119 and 469395117)
Version #4
upgrade tags
Tags
cables | 3 |
---|---|
circuits | 1 |
frequency | 60 |
name | NGCP Muntinlupa - Gardner Tie Line |
operator | Meralco |
operator:wikidata | Q6817918 |
operator:wikipedia | en:Meralco |
power | line |
source | Bing;Yahoo |
voltage | 115000 |
wires | double |
Nodes
3 nodes
- SPA-6 (4795414382) (part of ways Manila-Muntinlupa 230 kV line (592575456) and Manila-Muntinlupa 230 kV line (799749777))
- 4414992262
- 4414992263 (part of ways 469395119 and 469395117)
Version #3
[Sucat, Muntinlupa/NGCP transmission system/Meralco subtransmission and distribution system] retag 230 kV tie lines actually used for 115 kV and switchgear on former switchyard, now used as Meralco substation, add old name of Sucat Thermal Power Plant
- Edited by TagaSanPedroAko
- Changeset #47818893
Tags
cables | 3 |
---|---|
circuits | 1 |
frequency | 60 |
name | NGCP Muntinlupa - Gardner Tie Line |
operator | Meralco |
power | line |
source | Bing;Yahoo |
voltage | 115000 |
wires | double |
Nodes
3 nodes
- SPA-6 (4795414382) (part of ways Manila-Muntinlupa 230 kV line (592575456) and Manila-Muntinlupa 230 kV line (799749777))
- 4414992262
- 4414992263 (part of ways 469395119 and 469395117)
Version #2
[Sucat, Muntinlupa] realign/modify NGCP 230 kV transmission lines, add missing substation components, tag transmission line termination tower, realign some roads, remove non-existent segment of PNR Metro Commuter Line
- Edited by TagaSanPedroAko
- Changeset #45552698
Tags
cables | 3 |
---|---|
circuits | 1 |
frequency | 60 |
name | Muntinlupa Substation - Sucat Thermal Power Plant Switchyard Tie Line |
operator | National Grid Corporation of the Philippines |
power | line |
source | Bing;Yahoo |
voltage | 230000 |
wires | double |
Nodes
3 nodes
-
1866827480 - 4414992262
- 4414992263 (part of ways 469395119 and 469395117)
Version #1
[Muntinlupa] add power line and towers, polygonize subdivision, adjust roads
- Edited by TagaSanPedroAko
- Changeset #42376036
Tags
cables | 3 |
---|---|
circuits | 1 |
frequency | 60 |
operator | National Grid Corporation of the Philippines |
power | line |
voltage | 230000 |
wires | double |
Nodes
4 nodes
-
1866827480 - 4414992262
- 4414992263 (part of ways 469395119 and 469395117)
- 4414992264 (part of ways 469395119, 799749761, and 441813415)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |